Primary Bathroom Refresh


This project focused on refreshing an outdated primary bathroom to enhance both functionality and aesthetics. The work included a complete reconfiguration of the shower and bath area, removing an old jacuzzi tub, and adding a new toilet closet. The renovation also featured the installation of new tile flooring, an upgraded shower, a modern vanity, a designer shelving system in the closet, fresh paint, new carpet, and updated fixtures. Completed in approximately 10 weeks, the result is a beautifully transformed primary bathroom tailored to the client’s vision.

Pool Bathroom Refresh


The goal of this project was to rejuvenate an outdated pool bathroom, creating a more functional and modern space. The scope included relocating the shower and toilet for improved layout, crafting a custom cabinet designed specifically for pool towel storage, and updating the space with new tile flooring, a refreshed shower, a sleek vanity, and updated fixtures. This transformation was completed in approximately five weeks, delivering a stylish and efficient pool bathroom tailored to the client’s needs.

Primary Bathroom and Bedroom Refresh


This project focused on updating and modernizing a primary bathroom and adjacent areas. The bathroom refresh included removing the popcorn ceiling, replacing an outdated bathtub with a new shower and shower door, installing a new toilet and flooring, and revitalizing the vanity with fresh paint, new mirrors, and updated fixtures. The scope also extended to painting the bathroom, closet, bedroom, and hallway for a cohesive look. The customer collaborated with a friend to replace carpet with wood floors, complementing the overall transformation. Completed in approximately six weeks, this project delivered a fresh, modern space tailored to the client’s preferences.